Client
4th Dimension Properties
Type of Project
Services Performed
Market
Commercial
Duration
3 Months
The Bellis Fair Mall asphalt maintenance project in Bellingham, WA included work from the grinding, paving, sealcoating, and striping crews to get the large project done on a tight timeline. WRS was able to give a 1,200-foot-long stretch of road outside the Bellis Fair Mall a much-needed update. 320,000 square feet of sealcoating and 23,000 linear feet of striping (almost 4.5 miles worth) went into this project.